Battersea Power Station in London required a vacuum excavator during their regeneration project which is currently in phase 2 of the project. Phase 2 runs over 156 weeks, entailing the excavation and removal of 120,000m³ waste soils.
Removal of soil waste within an area of poor access.
Access to the location requiring excavation.
32 tonne “Mega” Vac-Ex complete with “Mega Arm” extendable hydraulic power arm and extension kit were utilised to reach area of excavation.
Works completed to programme with ZERO strikes. There were no reported incidents in respect of service strikes.