Greater Manchester Rail

Greater Manchester Rail

Background

Vac-Ex have recently completed a vacuum excavation project during a rail infrastructure upgrade in Greater Manchester.

Job Description

Ballast to be removed between rails and mapping of rail services.

Key Issues

A 32t Mega vacuum excavation unit with “Mega Arm” extendable hydraulic power arm required to access all ballast excavation with limited access to the area and rail closure in place.

Solution

Our 32t Mega vacuum excavation unit was used to safely excavate around rail using plastic dig pipes.

Conclusion

The 32t Mega vacuum excavation unit utilised having a long reach hydraulic power arm with ZERO strikes. There were no reported incidents in respect of service strikes.

Enquire Here